Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

Waste and energies

Doussoulin J.P.; Mougenot B. · Elgar Encyclopedia of Energy Economics (2025) · DOI: 10.4337/9781035310371.000130

Resumen

The unit commitment (UC) problem in wholesale electricity markets involves determining the optimal production schedule for a set of generation units while meeting various technical and economic constraints. These constraints include minimum up-time, minimum downtime, ramp rates, and reserve-capacity requirements. The UC problem is critical for ensuring reliable electricity supply and efficient market operation. It is typically solved using complex modeling techniques such as dynamic programming, integer and linear programming, Lagrangian relaxation, and evolutionary programming. The increasing penetration of renewable energy sources, energy storage, and electric vehicles necessitates innovative UC models. Future developments in market design and regulatory policies will further impact the UC problem, making it a continually evolving area of interest for researchers and policymakers. © The Editor and Contributing Authors Severally 2025

Instituciones: Universidad San Ignacio de Loyola