Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

Times Optimization in the Installation of Loading Pipes in Underground Mining Operation

Sereno-Ricse R.; Trinidad-Guerra F.; Hinostroza-Arias J.; Velasquez-Costa J. · IEEE Andescon, ANDESCON 2024 - Proceedings (2024) · DOI: 10.1109/andescon61840.2024.10755737

Resumen

Economic policies and the crisis caused by COVID-19 have harmed mining production, with minimal, slow, and conservative investments. An alternative to improve this is underground mining, which represents 43% of worldwide operations; however, the limited production and the number of accidents are limiting, so the procedure for the optimization of times and the time of exposure of workers to danger during the installation of loading tubes were evaluated. For this, the current and improved PAD and POD were analyzed (after the modification of the bit and loading tube), evidencing that in the current procedure, it takes 91 minutes for the installation, with an advance of two and a half cycles. In contrast, in the improved situation, it takes 23 minutes, reaching three cycles, concluding that there is an optimization of 68 minutes per cycle. The time of exposure to danger is also reduced by 2.8 hours.

Instituciones: Universidad Continental