PREFABRICATED REINFORCEMENT IN CONSTRUCTION USING VDC: CASE STUDY OVALO MONITOR BRIDGE
Tuesta R.; Vicuña M.; Del Savio A.A.; Palpan A.; Valle E.; Quiroz F. · 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 (2022) · DOI: 10.24928/2022/0210
Resumen
In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-meter span bridge located in Lima, Peru. The objective was to reduce structural rebars' assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved.
Instituciones: Universidad de Lima