Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

Plan for the improvement of the water resources monitoring network in the Chillon, Rimac, Lurin and Alto Mantaro basins, Peru

Eduardo C.-V.; Cesar T.G. · Proceedings of the IAHR World Congress (2022) · DOI: 10.3850/iahr-39wc2521716x2022139

Resumen

The purpose of the research was to provide support to the Water Observatory of the Peruvian Water National Authority through a Plan for the Improvement of the Water Resources Monitoring Network in the Chillon, Rimac, Lurin and Alto Mantaro basins (PMRMRH-CHIRILU). The PMRMRH-CHIRILU methodology had as a vision a proposal that ensures data in sufficient quantity and quality to be used in studies such as future simulation of the behavior of water resources. In this sense, the PMRMRH-CHIRILU was validated and derived from the analysis of the lack of information and the specific proposals of the diagnosis of the situational state of the existing surface and underground water monitoring networks in the basins. The methodologies used to propose new monitoring stations were the Voronoi diagrams for climatological stations, the Karasiev method for hydrological stations, the geomorphology and geological fault location for piezometric monitoring wells and the water quality index for surface water quality monitoring stations. Three new climatological stations, four hydrological stations, eighty piezometric monitoring wells and four surface water quality monitoring stations were proposed. The PMRMRH-CHIRILU, was validated by the institutions related to the management of water resources in the basins of the Chillon, Rimac and Lurin and Alto Mantaro-CHIRILU. Likewise, it considered the accessibility conditions and the feasibility of financing the installation and maintenance costs of the proposed stations.

Instituciones: Universidad Nacional Agraria La Molina