LEAN AND BIM INTERACTION IN A HIGH RISE BUILDING
Chuquín F.; Chuquín C.; Saire R. · IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges (2021) · DOI: 10.24928/2021/0208
Resumen
Lean Design has been spreading its use in the AEC industry along with the emergence of Building Information Modelling (BIM).Those two methodologies; Lean and BIM are being implemented first independently and then together. as new means to deliver more efficient projects. This paper researches some tools of Lean and BIM that permit a positive interaction by focusing on a case study related to a high rise building for residential use. Those tools are; from Lean Construction, set based design and value stream mapping. From BIM were used a 3D model and Integrated Concurrent Engineering (ICE) sessions. Also, the paper describes the interaction between those tools in the design phase and its impact in the construction stage. © Prof. Luis F. Alarcón and Assoc. Prof. Vicente González, IGL2021 All rights reserved.