Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

Increased productivity through a production management model with Lean Six Sigma (LSS) in the glass industry

Morales-Mercado G.N.; Meza-Soto L.M.; Quiroz-Flores J.C. · ACM International Conference Proceeding Series (2023) · DOI: 10.1145/3587889.3587970

Resumen

The Peruvian glass industries' main problem is that they present constant problems in their production process, which negatively impacts their productivity. Therefore, this is due to the need for more implementation of continuous improvement methodologies in the organization. Therefore, this research sought to increase productivity by reducing waste and paralyzed orders in the production process due to poor maintenance of machinery and errors generated by the workforce. That is why it was proposed to implement an improvement model in production processes focused on solving labor and machinery problems using the Lean Six Sigma methodology through the steps of DMAIC, using tools such as TPM, BPM, and standardized work. As a result, after the implementation of the model, it was possible to increase productivity by more than 15%, reduce the percentage of waste by less than 4.5% and reduce the number of paralyzed orders in the production process by 10%.

Instituciones: Universidad Peruana de Ciencias Aplicadas