Improvement proposal in environmental management to reduce costs in a construction project for an alcoholic beverage factory, Cartavio 2024
Angel Rodríguez-Alza M.; Jesus Garcia-Rodriguez J.; Benjamin Silva-Iparraguirre J. · Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology (2025) · DOI: 10.18687/laccei2025.1.1.1766
Resumen
This paper addresses the environmental management of an infrastructure construction project for an alcoholic beverage factory, focusing on identifying and mitigating the environmental impacts generated during its execution. Three main root causes were diagnosed: particulate matter emissions, solid waste generation and excessive noise, whose effects generate environmental risks and additional operating costs. As a solution, a Prevention, Remediation, and Mitigation Plan was designed to implement specific measures, such as emissions control, proper waste management, and regulation of noisy activities, together with an Environmental Contingency Plan to respond to emergencies. The P.A.M.A. Matrix tool made it possible to structure these actions and evaluate their impact on the environment. The financial analysis of the project showed its viability, with a TMAR of 1.88%, an NPV of S/. 14,761, an IRR of 43% and a B/C of 2.19, which indicates that for each sol invested, S/. 2.19 of profit is generated. These results demonstrate the effectiveness of the proposal, both environmentally and economically, ensuring the sustainability of the project, regulatory compliance and protection of the natural environment.
Instituciones: Universidad Privada del Norte