Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D
Yachachin K.R.H.; Hurtado N.C.T.; Roca J.A.A. · 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings (2023) · DOI: 10.1109/coniiti61170.2023.10324105
Resumen
In the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, these causes can be unsolicited RFIs in the period of observations and delayed approvals, reprocessing of nonconformities, among others. Therefore, a guide was proposed to reduce execution times in multi-family projects executed by SMEs in which BIM 4D and Lean Construction are implemented. In this guide, 4 phases are explained in which BIM 4D and Lean Construction software and tools are applied to analyze interferences and restrictions, as well as optimize the workflow through optimal planning, which would allow avoiding and/or or mitigate delays. However, this guide would not only be reducing delays, but also cost overruns, so there would be an economic improvement apart from the temporary This is demonstrated by implementing the guide in a multifamily project, in which the cost overruns initially generated by delays were reduced by 70%.
Instituciones: Universidad Peruana de Ciencias Aplicadas