Design and Implementation of a Materials Requirement Plan, a Preventive Maintenance Plan and Kardex in a Table Water Bottling Company to Reduce its Operational Cost
Castillo R.; Llanos A. · Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology (2021) · DOI: 10.18687/laccei2021.1.1.85
Resumen
The present work was prepared with the objective of implementing different engineering tools in the water bottling company EBERIA S.A.C. from the city of Trujillo, Peru. The work had an initial stage of diagnosis, where different problems were identified as unsatisfied demand, machine stops, return and loss of water barrel. For the solution of these, two solution alternatives were proposed, which were evaluated with realistic constraints and the most appropriate were selected, in order to determine which tools best suited the current context of the company. The implemented tools were Materials Requirement Plan, Preventive Maintenance and Kardex and the results were compared with appropriate engineering standards to determine their impact. Finally, it was obtained an annual reduction of S/5,231.41 in costs and at the same time the impact of the implementation of the tools developed was evaluated, obtaining an IRR of 29%, NPV of S/3,496.00 and a B/C of 3.05.
Instituciones: Universidad Privada del Norte