Construction Input Price Forecasting for Probabilistic Contingency Estimation in a Road Infrastructure Bridge Case Study
Ariza Flores V.A.; Pinedo D.; Orellana A.; Pinedo A. · Buildings (2026) · DOI: 10.3390/buildings16112124
Resumen
Road infrastructure projects are frequently affected by cost overruns driven by volatility in critical construction inputs and by the uneven association between external market shocks and material price movements. However, existing studies still provide limited evidence on how comparative forecasting, temporal price-signal diagnostics and probabilistic simulation can be integrated into a contingency-oriented decision framework. This study examines how construction input price forecasting and probabilistic simulation can inform contingency estimation in a road infrastructure case study. The empirical application is based on a Peruvian bridge project and combines benchmark-oriented forecasting using Bi-GRU and Random Walk models, descriptive temporal diagnostics based on lead–lag assessment and rolling-correlation analysis, and Monte Carlo simulation. Monthly series for structural steel, construction steel, cement, and diesel were transformed into log-returns and evaluated under a strict chronological design, while oil, the exchange rate, and the consumer price index were incorporated as exogenous variables. The Random Walk model produced lower forecasting errors for most inputs, achieving lower RMSE values in seven of the eight input-period comparisons; Bi-GRU outperformed it only for diesel in the test subset, with a 7.24% lower RMSE. From a project cost-risk perspective, the P95 contingency was estimated at 3.92% under Bi-GRU and 3.96% under Random Walk, indicating a similar upper-percentile contingency envelope under both forecasting specifications. The findings support contingency as a confidence-based budgeting decision rather than a fixed percentage.
Instituciones: Universidad de San Martín de Porres; Universidad Nacional Federico Villarreal; Universidad Privada del Norte