Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

BIM application in the operation and maintenance management of a sports infrastructure

Guzman G.; Ulloa W. · IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020 (2020) · DOI: 10.24928/2020/0015

Resumen

Operation and Maintenance (O&M) stage is the most expensive phase during the life cycle of a building. Currently, much of the information used in there is still paper-based and is delivered to the owner months after the facilities are in use. Therefore, it is necessary to study the interaction between Lean principles and Building Information Modeling(BIM) Functionalities in the building during O&M phase to optimize resources. This paper proposes a BIM-FM workflow and compares it with traditional Facility Management in a Peruvian sports infrastructure. The case study was Aquatic Center for the XVIII Pan-American Games and VI Parapan-American Games Lima 2019. The sport infrastructure was designed and built under an Integrated Project Delivery (IPD) environment applying BIM methodology until the construction phase. The main difference found is that proposed BIM-FM workflow improves the efficiencies of the workforce for accessing to accuracy and complete information about Facility’s components. Finally, the paper presents barriers in the BIM-FM implementation evidenced in the case study.

Instituciones: Universidad Nacional de Ingeniería