Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

Benefits of Last Planner System and Asana Integration in Improving Finish Planning in Multi-Family Buildings

Núñez K.; Torres V.; Velasquez J. · International Conference on Civil, Structural and Transportation Engineering (2025) · DOI: 10.11159/iccste25.182

Resumen

The article "Benefits of Last Planner System and Asana Integration in Improving Finishing Planning in Multifamily Buildings" addresses the shortcomings in finishing planning in multifamily buildings. The authors propose a methodology that combines the Last Planner System (LPS) with the Asana management tool to improve communication and collaborative work between teams. Through simulations and surveys of experts, communication problems and lack of adequate tools in current planning were identified. The integration of LPS and Asana is presented as an effective solution, offering a more efficient planning structure, access to real-time updates, and a clear assignment of responsibilities. The results suggest that this methodology can optimize project planning, reduce errors, and improve alignment in the execution of finishing tasks.

Instituciones: Universidad Peruana de Ciencias Aplicadas