Saltar al contenido
República del Perú · Observatorio de la producción científica universitaria
OApol.org Observatorio de Inteligencia Científica Universitaria del Perú
OApol.org
Inicio Universidades Publicaciones Investigadores
Repositorios
Tesis y trabajos académicosRevistas
Indicadores
Ranking trimestralRanking por carreraObjetivos de Desarrollo SostenibleReporte OCDERed neuronal 3D
Acerca
MetodologíaPrivacidad

An Effective Mathematical Model for Advanced Planning and Scheduling in Multi-Plant Chain

Pérez M.F. · Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology (2022) · DOI: 10.18687/laccei2022.1.1.539

Resumen

This work addresses the advanced planning and scheduling problem. This problem is an extension of the Flow Shop, Job Shop, Flexible Job Shop, and Integrated Resource Selection and Operation Sequences problems, being its main characteristics the precedence relationship between operations that are part of customer orders, the batch size of the orders, the flexibility of the machines, which are in different plants. In order to solve the problem, a mixed-integer linear programming model is proposed, which seeks to minimize the makespan. The computational results show that the mathematical model was able to solve the cases or instances generated in a satisfactory way.

Instituciones: Pontificia Universidad Católica del Perú